top of page
< Back

Though not located in the Special Flood Hazard Area, this new construction apartment building project in Newark, NJ sustained heavy flood damages from Hurricane Ida in September 2021. After experiencing the damages first hand, the General Contractor reached out to Floodproofing.com to begin exploring possible dry floodproofing solutions to prevent any future flood damages. It was decided that the ILC Flex-Cover® would be the ideal solution since the barriers were readily available and met FM Approval standards. This provided the GC with peace of mind knowing that the product conforms to the highest standards of safety and property loss prevention.

532 Mulberry St.

Completion Year 
Location
Type
Flood Protection
Product(s)

2022

Newark, NJ

Standard Door Flood Barrier

4'

(2) 54" x 4' and (1) 92" x 4' Flex - Cover®

LEARN MORE
bottom of page